liberty textile

Project highlights
client: Liberty Textiles
location: Karachi, Sindh, Pakistan
sector: Textile
solar power project: 6.56 MW
Download PDF
Share with:
Follow by Email
LinkedIn
Share
WhatsApp

Liberty Textiles Mills opted for solar to reduce the load on PV gensets and ensure uninterrupted energy supply. The business signed up for a 1.3 MW plant with Reon in 2018 at its facility in Karachi.

This led to two more successive plants in 2021 at Liberty site and Nooriabad plants amounting to an additional 5.2 MW solar project deployment. The solar power project will produce 9,878 MWh of energy annually offsetting carbon emissions by 6,075 tonnes.

The site at Liberty also houses a 21kW outdoor photovoltaic (PV) testing station to test modules of various technologies and system performance under varied weather conditions. The simulated testing site is used to determine long term performance of modules and system reliability.

CONNECT WITH US

If you are determined to create energy efficiency and decarbonization for your industry, if you are a technology enthusiast – connect with us or subscribe to our monthly newsletter to stay connected. You can also use the form beneath to submit your enquiry.